            Sewage Treatment Project of a mining company in Tibet

            Sewage Treatment Project of a mining company in Tibet

            Project address:Tibetan

            Category:Mining

            Application materials:Copper-nickel mixed concentrate

            Daily processing capacity:750 tons/day

            Name
            Email*
            Material

            -Scan and add friends-

            -Exclusive service for you-

            Hotline:0371-86151888

            Case introduction

            A mining development company in Tibet told us that the method they used to deal with mining waste water was natural drying, but the result of natural drying was that the water content after slurry treatment was still 60%, the mud can not pile up, which causes difficulties in transportation and stacking, and the cost is high and the efficiency is low. When the construction is tense, it can not meet the requirements of construction progress, and even the construction site environment is bad, and the overflow of mud water makes it difficult to get involved, the engineering team often suffers huge fines due to pipe blockage caused by mud water leaking into the sewer.

            Mining waste water mainly comes from the drainage of wet dedusting in the process of ore crushing, ground washing water and ore dressing waste water in ore crushing and screening workshops, corridors and ore transfer stations. Mineral Dressing wastewater containing a large amount of suspended solids is usually recycled for mineral dressing after sedimentation, and the sediment enters the mineral dressing system according to its composition and then discharges into the tailing system. Tailing is one of the ineffective products in the process of ore dressing, which mainly includes heavy metals such as mercury, cadmium, lead, chromium and other elements with significant toxicity such as non-metallic sulfur and arsenic, as well as zinc, copper, nickel and other elements with certain toxicity, tailings leachate will cause groundwater and soil pollution, people drink unclean underground water or consume heavy metals into their bodies by eating crops, which will lead to serious consequences.

            The laboratory of our company gave a feasible scheme after testing the waste water: it flows into the three-layer sedimentation tank through the drainage ditch, and the clean water generated by the water passing through the three-layer sedimentation tank after a long time of sedimentation can be recycled. Use a mixer in the three-layer sedimentation tank, stir evenly, and use a slurry pump to drive the slurry from the three-layer sedimentation tank into the slurry tank. Use the medicament conditioning tank to add medicine (add the medicament into the mud tank through the medicament tank). After the mud tank is evenly stirred by the mixer, it is provided by the plunger Mud Pump (the plunger mud pump needs to be specially customized, using the spherical valve core) dripping into the filter press for dehydration treatment, the mud cake formed by the treatment is pulled away and buried, and the clean water flows into the clear water tank for recycling, finally achieving the purpose of turning the sewage into clean water.

            礦山開采

            Customer feedback

            Beibang's equipment has good performance, high degree of system automation, relatively intelligent control system and excellent quality of the whole equipment and external matching. The form of EPC project general contract shortens the sludge treatment cycle, reduces the treatment cost, and even creates a better construction environment for our engineering team staff. We are very satisfied!

            Recommended cases

            View more

            Related products

            View more
            Sheet Filter

            Filtration Area:10-30㎡

            Number of Filter Plates:16-49pieces

            800 Chamber Filter Press with Automatic Plate Shifter

            Filtration Area:30-80㎡

            Number of Filter Plates:23-62pieces

            800 Mechanical Plate-and-Frame Filter Press

            Filtration Area:30-80㎡

            Number of Filter Plates:23-62pieces

            Number of Filter Frame:24-63pieces

            630 Mechanical Plate-and-Frame Filter Press

            Filtration Area:15-40㎡

            Number of Filter Plates:18-49pieces

            Number of Filter Frame:19-50pieces

            E-mail: info@bbnep.com
            Sales Hotline:+86-0371-63687155
            Address of Marketing Center:Floor 10, Building B, Xicheng Science Technology Building, Hi-tech Zone, Zhengzhou.
            Headquarters:Yuzhou City, Henan Province (turn right for 500 meters from the southern exit of Zhengzhou-Luanchuan Express Way)
            All rights are reserved by Henan BEBON Intelligent Environmental Protection Engineering Technology CO., Ltd 工信部備案號: 豫ICP備19039114號-2
            Online
            Email
            Top
            姐妹综合久久
                  1. <p id="en5pn"><strong id="en5pn"><small id="en5pn"></small></strong></p><tr id="en5pn"></tr><tr id="en5pn"></tr>
                    <pre id="en5pn"></pre>