            Home News Industry Information Process design knowledge

            Solution for mining treatment

            Solution for mining treatment

            Time:2019.11.14 Reading:1

            Application materials: mining application equipment: plate and frame filter press Scheme Introduction: Mine waste water mainly comes from pit water discharged from mining production, rain waste water from waste stone yard and ore washing and tailing...

            Applied Materials: Mining

            Applicable equipment: plate and frame filter press

            未標題-5


            Scheme Introduction: Mine waste water mainly comes from pit water discharged from mining production, rain waste water from waste stone yard and ore washing and tailings waste water discharged from ore dressing plant, according to the analysis of Bebon laboratory, there is a certain amount of special acidic waste water in the Experimental Mine waste water, including heavy metals such as mercury, cadmium, lead, chromium and other elements with significant toxicity such as non-metallic sulfur and arsenic, and there are some toxic elements such as zinc, copper, nickel, etc., and the tailing leachate will cause the pollution of groundwater and soil. The scheme we give is: flow into the three-layer sedimentation tank through the drainage ditch, the water through the three-layer sedimentation tank can be recycled after long precipitation. Use a mixer in the three-layer sedimentation tank, stir evenly, and use a slurry pump to drive the slurry from the three-layer sedimentation tank into the slurry tank. Use the medicament conditioning tank to add medicine (add the medicament into the mud tank through the medicament tank). After the mud tank is evenly stirred by the mixer, it is provided by the plunger Mud Pump (the plunger mud pump needs to be specially customized, using the spherical valve core) dripping into the filter press for dehydration treatment, the mud cake formed by the treatment is pulled away and buried, and the clean water flows into the clear water tank for recycling, finally achieving the purpose of turning the sewage into clean water.

            Related News

            View more

            Related products

            View more
            Sheet Filter

            Filtration Area:10-30㎡

            Number of Filter Plates:16-49pieces

            800 Chamber Filter Press with Automatic Plate Shifter

            Filtration Area:30-80㎡

            Number of Filter Plates:23-62pieces

            800 Mechanical Plate-and-Frame Filter Press

            Filtration Area:30-80㎡

            Number of Filter Plates:23-62pieces

            Number of Filter Frame:24-63pieces

            630 Mechanical Plate-and-Frame Filter Press

            Filtration Area:15-40㎡

            Number of Filter Plates:18-49pieces

            Number of Filter Frame:19-50pieces

            E-mail: info@bbnep.com
            Sales Hotline:+86-0371-63687155
            Address of Marketing Center:Floor 10, Building B, Xicheng Science Technology Building, Hi-tech Zone, Zhengzhou.
            Headquarters:Yuzhou City, Henan Province (turn right for 500 meters from the southern exit of Zhengzhou-Luanchuan Express Way)
            All rights are reserved by Henan BEBON Intelligent Environmental Protection Engineering Technology CO., Ltd 工信部備案號: 豫ICP備19039114號-2
            Online
            Email
            Top
            姐妹综合久久
                  1. <p id="en5pn"><strong id="en5pn"><small id="en5pn"></small></strong></p><tr id="en5pn"></tr><tr id="en5pn"></tr>
                    <pre id="en5pn"></pre>